Home
The Team
Gallery
Sponsor Us
Contact Us
Mobile
.
Friday 20 April 2012
Proton Saga FLX
22:02
ICE Terminator
No comments
The car,
merah saga
Dashboard
Boot
Engine bay
The car was the first thing delivered to the teams. We wasted no time in taking out the
engine
and transmission.
Posted in:
Email This
BlogThis!
Share to Twitter
Share to Facebook
Newer Post
Older Post
Home
0 comments:
Post a Comment
Subscribe to our RSS Feed
Be Our Fan on Facebook
Share
Popular
Tags
Archives
Popular Posts
Controller programming
The motor controller given to us was preprogrammed. We can just wire it in and run it, and we did. To win a race however, one has to evalua...
Saga Model Incompatibility
When PROTON initially gave us the car , it was a Saga BLM 1.3 model. However for this competition, PROTON then decides to standardise the ca...
Day 3: The End
After 9 months of hard work and 3 days of action, the PROTON Green Mobility Challenge 2012 comes to an end. The closing event started with t...
Testing Motor 2
After confirming that the motor and controller are working properly, we improved the test to more closely resemble the actual situation. ...
Mounting
We have had some problem with adapting the transmission to fit the motor and the car. But finally, we got the parts together and mounted t...
PROTON Green Mobility Challenge 2012
PROTON Green Mobility Challenge 2012 (PGMC2012) is an initiative of PROTON, together with Agensi Inovasi Malaysia (AIM), to promote electr...
Day 1: Practice
It's October 5th, and finally, we're in Sepang International Circuit. The first day started with the registration and scrutinising o...
In-Car Wiring
Now that the car and its electrical engine system are together in the EV Lab , the wiring of the two can be integrated together. We're a...
Test Drive
The I.C.E. Terminator EV is moving!
Completing The Circuit
With the new electric engine in place, we reconnect all the wires and install the vacuum pump. Put the tyres back on and it's system go....
Blog Archive
▼
2012
(42)
►
October
(10)
►
September
(7)
►
August
(5)
►
July
(4)
►
June
(2)
►
May
(8)
▼
April
(6)
PGMC 2012 Soft Launch
Proton Saga FLX
Proposal Presentation
The Team
PROTON Green Mobility Challenge 2012
I.C.E. Terminator
Facebook
0 comments:
Post a Comment